This Web site was designed using Web standards.
Learn more about the benefits of standardized design.

Quick Links

Diller-Odell High School: News

E-mail Article Print Article


Story image 1_0

Wind Tower Installed

February 06, 2009

On February 5,  the new Wind Generator Tower was installed, with the help of  Norris Public Power, and a group of graduate students from the University.  


Story image 2_0

The tower is 60 feet tall, with a 2100 watt generator and 12 foot diameter blades.  Grants paid for most of the tower, including a Rural Business Enterprise Grant from the USDA.


Story image 3_0

Back To Top